Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637310
| No.13637310
- Product Categories
- Friendly Links
- home > Supply > Road asphalt, bitumen, Xihu District, Nanchang colored asphalt pavement construction
| Information Name: | Road asphalt, bitumen, Xihu District, Nanchang colored asphalt pavement construction |
| Published: | 2015-04-03 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009 year, is a professional road asphalt industry chain integrated company, providing customers with a full range of asphalt industry services, business areas mainly for asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business the spirit of hard work, the principle of sincere and trustworthy, asphalt pavement construction industry has been recognized by the owners and customers. Notes 1 Asphalt Pavement. After spraying the oil should not flow through the layer of asphalt much money should go into the bottom of the depth must not constitute an oil film on the outside. 2. In case of high winds or about to rain, you can not spray through the layer of oil. 3. When the temperature is below IO ~ C should not be sprayed through the layer of oil. 4. Shall design a uniform spraying fuel injection quantity, when tainted spill should sprinkle artificial fill. 5. Must be tough to stop and vehicle traffic through layer after spraying oil. 6. Asphalt paving asphalt in front, still remaining part should not enter the bottom of the asphalt eradicated. 7. Permeable layer should be plenty of tarps and sprinkle soaked, usually less than 24h after top talent paving, but they can not do upper construction for a long time, as soon as possible after construction through the layer of oil spray. 8. After a stable inorganic contact semi-rigid material is sprayed through the bottom layer of oil, if not timely paved surface, and the need to open the traffic, shall be covered by the appropriate spread stone chips or sand, at the moment should be transparent layer of oil to add 10% dosage. With steel drum roller 6-8 regulator again, and speed control. Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009 year, is a professional road asphalt industry chain integrated company, providing customers with a full range of asphalt industry services, business areas mainly for asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business the spirit of hard work, the principle of sincere and trustworthy, asphalt pavement construction industry has been recognized by the owners and customers. Impervious and pervious asphalt road asphalt road What is the difference permeable asphalt road information Engineering experience. As we all know, in order to reduce traffic noise disturb the environment, safety and driving comfort, over the years, everyone on the car continuously improved functionality, and a lot of research work is currently focused on improving the structure and selection of permeable asphalt pavement as the road information. Permeable pavement called "noise pavement drainage" is a new road construction, raw materials mixed in a specially developed modified asphalt, lime, fiber, can effectively reduce the sound blasting high-speed vehicles and the road surface friction caused And with a complete drainage system itself, so that rain water infiltration, surface water reflection phenomenon became history, motor vehicle skidding rain phenomenon will be greatly reduced. Impermeable asphalt road asphalt plain, not mixed with slaked lime materials, fibers, can effectively reduce the high speed of the vehicle and the road surface friction caused by the explosions, but itself does not have a complete drainage system, can not make rainwater infiltration, can not avoid the path area water reflections, rain slippery vehicle. Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009 year, is a professional road asphalt industry chain integrated company, providing customers with a full range of asphalt industry services, business areas mainly for asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business the spirit of hard work, the principle of sincere and trustworthy, asphalt pavement construction industry has been recognized by the owners and customers. Asphalt pavement construction work site safety tips pavement sweeping a security key, road sweeping road to be completely closed to all vehicular traffic stop, prevent vehicle damage. 2, road cleaning operations should downwind side hair, stop outlet for people. 3, hairdryer site refueling colored asphalt manufacturers to pay attention to the fire. 4, polyester fiberglass industry Busch operations personnel, it is necessary to leather overglove. First, gravel spreader job security key 1, spreading gravel spreader speed to be stable, does not allow the shift in the spreading process. 2, spreader during working asphalt equipment, rigid connection with the dump truck, while spreading, while pouring; and spreading can be intermittent lane until the dump finished unloading the car then spreading to prevent spreading bump dump truck machine. 3, to prevent self-spreader remote handling. 4, the spreader in the job process to settle alert personnel, pay attention to pedestrians and vehicles, to prevent splashing wounding bump and rubble trouble. Road asphalt, bitumen, Xihu District, Nanchang colored asphalt pavement construction provided by Nanchang Road, Highway Engineering Co., Ltd. through the asphalt. Nanchang Road through the asphalt highway engineering Limited (www.dt0791.com) strong, credible, transportation project in Nanchang, Jiangxi collaboration industry has accumulated a large number of loyal customers. The company better work attitude and continuous improvement through innovative ideas will lead the asphalt road and you hand into the brilliant, for a better future! |
Admin>>>
You are the 22949 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Road through the asphalt highway Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22949 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Road through the asphalt highway Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

