Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637310
| No.13637310
- Product Categories
- Friendly Links
- home > Supply > The cost of asphalt roads, road through rubber asphalt road (certified), Nanchang asphalt
| Information Name: | The cost of asphalt roads, road through rubber asphalt road (certified), Nanchang asphalt |
| Published: | 2015-03-22 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009 year, is a professional road asphalt industry chain integrated company, providing customers with a full range of asphalt road asphalt industry services prices, the main business areas of asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business, the spirit of hard work, the principle of sincere and trustworthy, asphalt pavement construction industry has been recognized by the owners and customers. Asphalt pavement repair work, the following three aspects must pay attention to the essentials when one is pouring hot asphalt repair, pay attention to three points. 1, before pouring, to use a hair dryer and hooks to the cracks in the dust cleared away debris; 2, when hot asphalt heating, the temperature should reach 130 ℃, to maintain its good liquidity; 3, after the completion of infusion, To asphalt cooled to about 60 ℃, when the plasticity remain with the shovel to eradicate excess surface asphalt pavement to prevent contamination. Second, the surface layer of the thermal stoppage time, pay attention to three points. 1, the heat drying diseased road to wait until the temperature reaches 100 ℃ or more before starting work; 2, use the iron rake will harrowing road surface disease and eradicate large aggregate surface, in order to ensure repair effect; 3, add a new After the material cost of the asphalt road, to comb uniform shaking, rolling dense. Third, when Wabu filling, pay attention to four points. 1, chiseled disease layer, after clearing waste, use a hair dryer to repair high voltage interface completely blowing ensure repair the bed clean and free of debris and floating dust; 2, sprinkle sticky layer of oil to be filled with the interface, and does not flow, unleavened dough should not be dead; 3, layered filling thickness or greater than 6, the seams around the filler to be slightly higher, and to hierarchical compaction, compaction degree to be above 95%; 4, after the filling is completed, must painted four weeks with cold glue joints to prevent water infiltration. Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009 year, is a professional road asphalt industry chain integrated company, providing customers with a full range of services bituminous asphalt industry, operating mainly in the field of asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business, the spirit of hard work, the principle of sincere and trustworthy, asphalt pavement construction industry has been recognized by the owners and customers. By using the finite element method for semi-rigid base asphalt pavement modeling now common to analyze the stress-strain behavior under static and dynamic loading of each structural layer of asphalt pavement and the maximum shear stress with depth changes of the road, you can get the following conclusions: (1) from Asphalt Pavement table 0 ~ 3 cm area belong to three to compression. Pavement surface prone to water damage, with good resistance to water damage to structures should be designed in; region (2) from the road surface 2 ~ 10 cm in a high shear stress area, this part of the main withstand shear stress and vertical compressive stress, this area is primarily generated rutting layers; (3) the end of the asphalt pavement under tensile stress under static loads, tension and compression in the cycle is repeated action by the dynamic load case, is the main starting pavement cracking horizon. Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009 year, is a professional road asphalt industry chain integrated company, providing customers with a full range of asphalt industry services, business areas mainly for asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business the spirit of hard work, the principle of sincere and trustworthy, asphalt pavement construction industry has been recognized by the owners and customers. Asphalt paving a security key, paver control stations and open horizon job site must eradicate all obstacles impede job. When the job is irrelevant personnel shall stay in control on stage. Managing member shall absent without leave. 2. Command to haul the car when unloading pavers, there should be someone harmonious action, simultaneously, to prevent the collision. 3, it is necessary to shift after the paver completely intermittently prohibit forced Guadang and shift or neutral slide on the ramp. 4, the control should be smooth, not sharp turn. When the price curve asphalt road work, ironing equipment distance ends with curbs shall not be less than 10cm, to prevent knocking. 5, clean diesel paver not come near open flames. 6, to ensure that material asphalt truck in good condition. Before applying the brakes respond, dump system for viewing, the bucket seals, and other solid tailgate. The cost of asphalt roads, road through rubber asphalt road (certified), Nanchang Nanchang Road Asphalt Ltd provided by the project through the asphalt road. Nanchang Road through the asphalt highway engineering Limited (www.dt0791.com) is a leader in Nanchang, Jiangxi, transportation cooperation projects over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In the asphalt road leading through the staff warmly welcome all inquiries negotiations to create asphalt road through a better future. |
Admin>>>
You are the 22949 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Road through the asphalt highway Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22949 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Road through the asphalt highway Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

