Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637310
| No.13637310
- Product Categories
- Friendly Links
| Information Name: | Emulsified asphalt plant, asphalt road through price (certified), Gian asphalt |
| Published: | 2015-03-17 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009 year, is a professional road asphalt industry chain integrated company, providing customers with a full range of asphalt industry services, business areas mainly for asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business . mixture mixing should be noted that with ordinary asphalt mixture mixing of several different items: 1, before mixing, mixing station should asphalt mixing tank and pipelines, trucks, construction machinery and equipment to enable the production of clean Target Mix design to maximize close mix, raw material properties should be stable. Add toner to consider its impact on the environment, because the toner than the major, in the mix with a colored, dispersion, adsorption, stability, thickening effect . mixing temperature should be controlled at 160 ℃ ~ 170 ℃ road asphalt, mixing time than the average time of 10s, after the material should be checked in two pellets and the color is uniform, mix paving: First, check whether the grassroots level under solid, smooth, clean, and check paving, compaction machinery is in good working condition; Then, sweeping base asphalt paver models, spraying emulsified asphalt 0.3-0.5kgm2 improve interfacial adhesion and reduce stormwater infiltration the pavement structure; then, in strict accordance with the pad will loose laying screed elevation good emulsified asphalt pad models, ensure the start paving thickness to meet the requirements; strict control of operating speed of the paver (speed range: 2.0 ~ 2.5mmin), ensure continuous paving; and finally, the whole site paving, uninterrupted time molding, rolling and timely reach the same color, uniform pellets, beautiful Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Nanchang Asphalt Pavement |.. Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009, is a professional road asphalt industry chain integrated company, providing customers full-service asphalt industry, operating mainly in the field of asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment rental business. Paving Mixture 1. Chosen according to road width 1-2 units with automatic adjustment paving thickness and leveling device, heated vibrating screed, and run good high-density asphalt paver paving. 2. End, the surface layer using the alignment method of construction, the surface layer using the balance beam construction method. 3. Paver uniform driving, walking speed and mixing plant yield matches to ensure uniform paving the road do not ask continually spreading. Paving allowed in free to change the speed of the process, to avoid half-way stop. 4. The temperature of the asphalt concrete paving adjusted according to temperature changes. Normal construction control in not less than 110 a 1300C, no more than 1650C, always check and make a record in the paving process. 5. Open shop before the paver screed heating to not less than 650C. 6. When using dual or three machines ladder into the type of construction, the spacing between adjacent machine control in 10 ~ 20m. Two overlapping should be 5 ~ 10cm width. 7. In the paving process, always check the quality paving, segregation occurs when phenomena such as artificial corners Queliao catch up spilled feed, for feeding. 9. Local paver can not work, and after the Engineer agrees to take artificial paving construction. Emulsified asphalt plant, asphalt road through price (certified), Gian provided by Nanchang Road asphalt through the asphalt highway engineering Limited. Nanchang Road through the asphalt highway engineering Limited (www.dt0791.com) is a leader in Nanchang, Jiangxi, transportation cooperation projects over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In the asphalt road leading through the staff warmly welcome all inquiries negotiations to create asphalt road through a better future. |
Admin>>>
You are the 22949 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Road through the asphalt highway Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22949 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Road through the asphalt highway Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

