Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637310
| No.13637310
- Product Categories
- Friendly Links
| Information Name: | Jiangxi asphalt road construction program _ _ Road through the asphalt mixing plant |
| Published: | 2015-02-14 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009 year, is a professional road asphalt industry chain integrated company, providing customers with a full range of asphalt industry services, business areas mainly for asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business the spirit of hard work, the principle of sincere and trustworthy, asphalt pavement construction industry has been recognized by the owners and customers. Routine maintenance of an asphalt mixing plant, check the oil lubrication points adequacy of the gas system in the mist should maintain a sufficient amount of oil. 2, the timely removal of accumulated material in the hopper, the sensor is normally zero. 3. To ensure that the cleaning of the machine and the surrounding environment. 4, check the electrical, electronics or without overheating, abnormal noise, the instrument indicates whether the normal signaling system is intact. 5, timely inspection, adjustment cylinder, valve and solenoid valve, so that the opening and closing to meet the requirements. 6, regularly check the system, such as tainted ash, leaks, spills and leakage to promptly deal with such phenomena. 7, a stirrer and a hopper should be cleaned once every four hours, so as to avoid residual concrete consolidation, hinder the normal operation. 8, each class should let go of the air compressor, air tank and filters the water inside, and troubleshoot the operation appears. 9. butterfly valves, mixers, solenoid valves, air filters and oil mist, etc. for maintenance in accordance with the instructions. Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station) asphalt mixing plant factory was established in 2009 asphalt pavement design, is a professional road asphalt industry chain integrated company, providing customers with a full range of asphalt industry services, business areas mainly for asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business, the spirit of hard work, the principle of sincere and trustworthy, asphalt pavement construction industry has been recognized by the owners and customers. Construction steps emulsified asphalt pavement penetration (1) the main floor spreading aggregate. Poured through the layer of oil or sticky layer of oil, then use the gravel spreaders, graders or artificial spreading major aggregates. To avoid spreading the aggregate when the particle size is uneven, and should check the thickness of loose laying, after spreading prohibited vehicle on a paved aggregate traffic. (2) rolling. After spreading the main floor with 6 ~ 8t aggregate light drum compactor conduct initial pressure, rolling speed control in about 2km / h. When rolling road should be gradually moved to the center since the road edge, overlapping each wheel tracks of about 30cm, after rolling over road humps and longitudinal slope inspection, do not meet the requirements, adjust leveling and then pressed. Heavy roller compacted after each round of overlapping about 1/2 track, rolling 4 to 6 times, until the main layer of aggregate interlock stable, no significant wheel tracks so far. (3) the main floor poured asphalt emulsion. After completion of the primary layer of aggregate compacted immediately poured the first layer of road asphalt emulsion, sprinkling method with emulsified asphalt surface layer shop Treatment Method. In order to prevent excessive leakage lotion available in the main floor after rolling aggregate stability, spreading on the first layer of caulking material in the latter part of the main floor poured asphalt emulsion. (4) spreading the first layer of caulking material. After the main layer emulsion poured asphalt mixing plant, using aggregate spreader or artificial spreading of the first layer of caulking material, caulking material immediately after spreading evenly sweep, inadequate office should Zhaobu. Caulking material spreader must be completed before the main floor emulsified asphalt breaking. Road construction program _ _ Jiangxi asphalt road through the asphalt mixing plant by Nanchang Road, Highway Engineering Co., Ltd. through the asphalt. Nanchang Road through the asphalt highway engineering Limited (www.dt0791.com) strong, credible, transportation project in Nanchang, Jiangxi collaboration industry has accumulated a large number of loyal customers. The company better work attitude and continuous improvement through innovative ideas will lead the asphalt road and you hand into the brilliant, for a better future! |
Admin>>>
You are the 22949 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Road through the asphalt highway Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22949 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Road through the asphalt highway Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

