Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637310
| No.13637310
- Product Categories
- Friendly Links
| Information Name: | Rubber asphalt | colored asphalt road through price (certified) | Gian asphalt |
| Published: | 2015-02-14 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009 year, is a professional road asphalt industry chain integrated company, providing customers with a full range of asphalt industry services, business areas mainly for asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business the spirit of hard work, the principle of sincere and trustworthy, asphalt pavement construction industry has been recognized by the owners and customers. Construction steps emulsified asphalt pavement penetration (1) the main floor spreading aggregate. Poured through the layer of oil or sticky layer of oil, then use the gravel spreaders, graders or artificial spreading major aggregates. To avoid spreading the aggregate when the particle size is uneven, and should check the thickness of loose laying, after spreading prohibited vehicle on a paved aggregate traffic. (2) rolling. After spreading the main floor with 6 ~ 8t aggregate light drum compactor conduct initial pressure, rolling speed control in about 2km / h. RCC should gradually move to the edge of the road since the road center, each about 30cm wheel tracks overlap modified bitumen test again after rolling road humps and longitudinal slope, such as when you do not meet the requirements, you should adjust leveling and then pressed. Heavy roller compacted after each round overlapping about 1/2 asphalt track, rolling 4 to 6 times, until the main layer of aggregate interlock stable, no significant wheel tracks so far. (3) the main floor poured asphalt emulsion. After completion of the primary layer of aggregate compacted immediately poured the first layer of latex, sprinkling method with emulsified asphalt surface layer shop Treatment Method. In order to prevent excessive leakage lotion available in the main floor after rolling aggregate stability, spreading on the first layer of caulking material in the latter part of the main floor poured asphalt emulsion. (4) spreading the first layer of caulking material. After sprinkling the main road asphalt emulsion layer, using aggregate spreader or artificial spreading of the first layer of caulking material, after the caulking material should be immediately swept spreading evenly, inadequate office should Zhaobu. Caulking material spreader must be completed before the main floor emulsified asphalt breaking. Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009 year, is a professional road asphalt industry chain integrated company, providing customers with a full range of asphalt industry services, business areas mainly for asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business . colored asphalt pavement structure recommended ⑴, unit or plant trunk road should be used in heavy traffic road design structure. General design ⑵, light traffic roads and sidewalks, bike lanes, landscaping and roads as a single colored asphalt concrete structure. ⑶, heavy traffic roads are generally designed for three asphalt concrete structure (ground floor + Middle + surface layer), bottom, middle are black asphalt, asphalt surface layer with color. ⑷, the general design for the road transportation of asphalt concrete floor structure (ground floor + surface layer), the underlying black asphalt, asphalt surface layer with color. ⑸, the original color of asphalt concrete pavement reconstruction of pavement and road conditions to be considered to prevent the reverse design of asphalt pavement crack treatment, retention and drainage design. ⑹, pavement tone color choices to consider the environment, road traffic and the color itself, color, dirt and durable and so on. Under normal circumstances, the heavy traffic road should be used red or brown asphalt pavement structure, light traffic roads or road multi-use landscape of red, yellow, blue, green. Rubber asphalt | colored asphalt road through price (certified) | Gian provided by Nanchang Road asphalt bitumen highway through Engineering Limited. Nanchang Road through the asphalt highway engineering Limited (www.dt0791.com) is a leader in Nanchang, Jiangxi, transportation cooperation projects over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In the asphalt road leading through the staff warmly welcome all inquiries negotiations to create asphalt road through a better future. |
Admin>>>
You are the 22949 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Road through the asphalt highway Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22949 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Road through the asphalt highway Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

