Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637310
| No.13637310
- Product Categories
- Friendly Links
- home > Supply > _ Road asphalt road price regeneration through hot asphalt pavement (certified) _ Ji'an asphalt
| Information Name: | _ Road asphalt road price regeneration through hot asphalt pavement (certified) _ Ji'an asphalt |
| Published: | 2015-02-03 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009 year, is a professional road asphalt industry chain integrated company, providing customers with a full range of asphalt industry services, business areas mainly for asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business the spirit of hard work, the principle of sincere and trustworthy, asphalt pavement construction industry has been recognized by the owners and customers. Impervious and pervious asphalt road asphalt road What is the difference permeable asphalt road information Engineering experience. As we all know, in order to reduce traffic noise disturbed asphalt concrete on the environment, safety and driving comfort, over the years, we continue to carry out the functions of the car has improved, but a lot of research work is currently focused on improving the structure and selection of permeable asphalt pavement as Road information. Permeable pavement called "noise pavement drainage" is a new road construction, raw materials mixed in a specially developed modified asphalt, lime, fiber, can effectively reduce the sound blasting high-speed vehicles and the road surface friction caused And with a complete drainage system itself, so that rain water infiltration, surface water reflection phenomenon became history asphalt, rain vehicle slipping phenomenon will be greatly reduced. Impermeable asphalt road asphalt plain, not mixed with slaked lime materials, fibers, can effectively reduce the high speed of the vehicle and the road surface friction caused by the explosions, but itself does not have a complete drainage system, can not make rainwater infiltration, can not avoid the path area water reflections, rain slippery vehicle. Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009 year, is a professional road asphalt industry chain of integrated bitumen cold recycling company, providing customers with a full range of asphalt industry services, business areas mainly for asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business, the spirit of hard work, the principle of sincere and trustworthy, asphalt pavement construction industry has been recognized by the owners and customers. Asphalt equipment (1) must be equipped construction machinery and accessories, do maintenance before the start, commissioning and trial machine asphalt concrete company, to ensure that during the construction hinder construction progress and quality of the general failure does not occur. Asphalt surface should be the full width of mechanized single continuous paving, for single two-lane surface layer should be implemented two paver echelon jobs, in order to ensure the quality of the pavement, and thus must be equipped with the following major construction machinery. ① batch asphalt mixing machine, yield more than 320t / H, comes with more than 80t thermal storage silo. All the production process by computer control, with a good print device, mixing machine should be equipped with dust removal device has two good lignocellulosic add devices. ② imported asphalt paver four. ③ When the top layer construction, and should be equipped with non-contact balance beam unit four. ④ Rollers: 25t more tire roller 4, 18 --- 20t tire roller 4, 8-13t tandem rollers 4 (must have a small hand-held vibratory roller 2). ⑤ above 15t dump truck load of not less than 20 units. _ Road asphalt road price regeneration through hot asphalt pavement (certified) _ Ji'an provided by Nanchang Road asphalt through the asphalt highway engineering Limited. Nanchang Road through the asphalt highway engineering Limited (www.dt0791.com) is a leader in Nanchang, Jiangxi, transportation cooperation projects over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In the asphalt road leading through the staff warmly welcome all inquiries negotiations to create asphalt road through a better future. |
Admin>>>
You are the 22949 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Road through the asphalt highway Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22949 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Road through the asphalt highway Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

