Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637310
| No.13637310
- Product Categories
- Friendly Links
- home > Supply > Asphalt plant manufacturers, Gian asphalt, emulsified asphalt road through the production
| Information Name: | Asphalt plant manufacturers, Gian asphalt, emulsified asphalt road through the production |
| Published: | 2015-01-22 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009 year, is a professional road asphalt industry chain integrated company, providing customers with a full range of asphalt industry services, business areas mainly for asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business the spirit of hard work, the principle of sincere and trustworthy, asphalt pavement construction industry has been recognized by the owners and customers. Asphalt pavement construction process a. Before Asphalt layer started under close supervision, in accordance with the site engineer selected regulatory requirements, with each of the asphalt paving the length of less than 200 m The section of the road test. For this purpose, will be provided, and the use of all equipment used in the normal production work. b. The purpose of this test is to prove the stability of the mix, and the elimination of obvious defects in the machinery and equipment, leaving the engineer satisfaction, and in accordance with the requirements of engineers based on the results of the test sections may be raised, free equipment or operations reasonable improvement . c. each do a test asphalt mixing floor, paving should drill specimens from the 12 hours after compaction material, and tested. d. Sampling, sample size and specimen identification are in line with the provisions of Chapter XI GB50092-96. e. as an approved test section that included the entire project, the completion of the project to make the payment. Such as engineers or accept, put all substandard roads cleared, after analyzing the reasons for re-paving, and bear all costs arising therefrom. Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009 year, is a professional road asphalt industry chain integrated company, providing customers with a full range of asphalt industry services, business areas mainly for asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business asphalt patching, the spirit of hard work, the principle of sincere and trustworthy, asphalt pavement construction industry has been recognized by the owners and customers. Winter asphalt concrete construction time requirements: a close attention to the weather conditions, a good grasp of the construction time, wind, rain, snow, the weather may not be carried out road construction hot mix asphalt. Asphalt pavement maintenance shall be carried out at high temperatures during the day in winter when the two asphalt concrete construction, night construction is strictly prohibited. Paving time should be at 9:00 to 16:00 conduct, so fast discharge, fast spreading, fast rolling. Asphalt project schedule at 11:00 am to 3:00 pm for. Winter compacted asphalt concrete paving requirements: 1 requires more than one paver joint operations to ensure the entire surface layer of asphalt paving forming minimize seams. 2 should adopt the high density of the paver, before paving screed to preheat. 3 Try to keep a continuous paving. 4 good measure wind envelope. 5 RCC paving hot pursuit, with the pressure to do with the spread. 6 edge in some areas, such as the right path to be a small vibratory rollers or vibrating plate compactor ram. Manhole edge of the area but also a vibrating plate compactor, compaction 7 after a hot iron supplement construction is completed, immediately do one seal layer on the asphalt surface layer and the layer below the surface layer. Asphalt plant manufacturers, Gian asphalt, emulsified asphalt road through Production Co. provided by Nanchang Road through asphalt road projects. Nanchang Road through the asphalt highway engineering Limited (www.dt0791.com) strong, credible, transportation project in Nanchang, Jiangxi collaboration industry has accumulated a large number of loyal customers. The company better work attitude and continuous improvement through innovative ideas will lead the asphalt road and you hand into the brilliant, for a better future! |
Admin>>>
You are the 22949 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Road through the asphalt highway Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22949 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Road through the asphalt highway Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

