Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637310
| No.13637310
- Product Categories
- Friendly Links
- home > Supply > Modified asphalt, asphalt road through highway construction (certified), Jiangxi asphalt
| Information Name: | Modified asphalt, asphalt road through highway construction (certified), Jiangxi asphalt |
| Published: | 2015-01-04 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009 year, is a professional road asphalt industry chain integrated company, providing customers with a full range of asphalt industry services, business areas mainly for asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business the spirit of hard work, the principle of sincere and trustworthy, asphalt pavement construction industry has been recognized by the owners and customers. The main method of asphalt pavement repair four First glue seepage. Mainly for the road network to crack, but no significant deformation, nor jack pulp phenomenon, you can use a thin coat of glue repair to prevent water penetration. Second, pouring water. When the pavement cracks but no significant dislocation, and no bite edge phenomenon, filling hot asphalt approach can be used for water treatment. Third heat drying feeding. Cracked pavement, cellular, and other pavement rutting deformation is not serious point, can be heat drying, appropriate to add new material, artificial stir, compaction reinforcement. Fourth Wabu filling. If the disease has spread to the pavement beneath layers, and even the grass roots, you must put all the diseases of the excavation area, stratified filling. Asphalt pavement repair work, the following three aspects must pay attention to the essentials. Nanchang Road highway Engineering Co., Ltd. (Nanchang asphalt | Jiangxi asphalt | Asphalt Pavement Nanchang | Jiangxi colored asphalt | Jiangxi spraying emulsified asphalt | Jiangxi asphalt works | asphalt pavement construction, Jiangxi | Jiangxi asphalt concrete mixing station), factory mixing station was established in 2009 year, is a professional road asphalt industry chain integrated company, providing customers with a full range of asphalt emulsion asphalt equipment industry services, business areas mainly for asphalt pavement construction, spray emulsified asphalt, sales and processing, asphalt pavement construction equipment leasing business, the spirit of hard work, the principle of sincere and trustworthy, asphalt pavement construction industry has been recognized by the owners and customers. It uses the principle of oil heating bitumen is heated to a higher temperature, high flash point mineral oil as the heating medium, mineral oil cycle activities in the catheter and snake plate camp, then heated liquid asphalt serpentine coil outside. HTF 5 4 heated by hot oil furnace (up to 300 ℃), the hot oil circulation pump 3 inhalation, the oil flows into the asphalt tank pipe 8 2 1 HTF serpentine coil. Heat conducting oil in the event, through the serpentine wall plate heating asphalt tank battalion asphalt. Then the price of asphalt, oil through the oil return pipe back into the hot oil furnace 9, the next heating cycle. Strengths of this approach is that HTF heater compact structure, easy to use, flexible heating, thermal power, high temperature is easy to take the initiative, even on asphalt heating temperature, heating speed. After engineered asphalt tank, oil serpentine coil add a total area of ??53.7 m2 heat total heat dissipation area reached 82.3 asphalt, which makes the transfer of power increased by 10%. Products produced 40 t liquid temperature of 160 ℃) Jjj green diesel needed to reduce the amount to 699 kg, each producing 1 t liquid asphalt products to save diesel 5.6kg. Diesel prices by 5.5 yuan / kg accounting, each producing 1 t to 30.8 yuan crystal asphalt save money. Asphalt products together shortening production cycle, reducing the costs and labor costs Jixietaiban hot oil serpentine coil modified asphalt, asphalt tank arrived and been tested hot oil circulation test, all pipeline leak. To asphalt overhead. Later Marini manufacturers also produced after the adoption of our qualified, that began to transform. Modified asphalt, asphalt road through highway construction (certified), Jiangxi Nanchang Road pass by asphalt road asphalt Engineering Limited. Nanchang Road through the asphalt highway engineering Limited (www.dt0791.com) is a leader in Nanchang, Jiangxi, transportation cooperation projects over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In the asphalt road leading through the staff warmly welcome all inquiries negotiations to create asphalt road through a better future. |
Admin>>>
You are the 22949 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Road through the asphalt highway Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22949 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Road through the asphalt highway Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

